Volkswagen, Hall H3b
LOZ III VWSL_2016
Building: Hall H3b – in-depth foundation of hall
Contractor: Strabag s.r.o.
Technology:
- piles of large diameter Ø 620 mm – 682 m
- piles of large diameter Ø 880 mm – 4 476 m
- piles of large diameter Ø 1180 mm – 372 m
- drilled circular piles caps Ø 1250 mm, Ø 1400 mm, Ø 1450 mm, Ø 1500 mm, Ø 1600 mm – 606 ks
- rectangular piles caps – 27 pcs
Construction period: October 2016 – February 2017