Senec – expansion of water conduit
Client: Bratislavská vodárenská spoločnosť, a.s.
Superior Contractor: TUBAU, a.s.
Structures description:
- delivery conduit DN 300 TVLT
- gaugin chamber
- outer piping distributions
- effluent conduit
- electric connection LV
- gaugin chamber and chlorine room
- machinery – and electrotechnological part
- water tank 1500 m3
Completed structures:
- construction of delivery conduit into water tank DN 300 of 2150 m length
- construction of effluent conduit from water tank DN 300 PVC of 870 m length
- construction of gaugin chamber and chlorine room with electrotechnological and machine-technological part
- installation of LV connection of 570 m length
- execution of cross-ignition tubes TVLT DN 400, DN 500
- constructing, machine-technological and electrotechnological reconstruction of existing water tank 1500 m3
Construction period: October 2006 – October 2007