R1 Modification of junction Sliac – Sielnica
R1 highway Sliac – Sielnica
Submitter: Eurovia Banská Bystrica
Technology: Ensuring slope stability under the bridge by the ground nails CKT of diameter 32 mm and application of reinforced nets and shotcrete.
Construction period: September 2016 – May 2017