CRAEMER Liptovský Mikuláš
Submitter: STRABAG Pozemné a inžinierske staviteľstvo s. r. o.
Technology: Large diameter piles 620 mm, 880 mm, 1180 mm; monolithic heads, pumping wells 600 mm, rope anchors steel spreader beam to secure the construction pit
Contruction period: May 2020 – September 2020